Radiologic

REPRESENTATIVE PROFESSIONAL EXPERIENCE

Property Assessment
Preparation of Phase I and II environmental assessments for the property -

  • Review all leases and other documents to maintain an environmental indemnification.
  • Prepare facility Health and safety Plans.
  • Oversee geotechnical soil borings including sampling and analysis for chemical and physical parameters.
  • Oversee the excavation, transpiration, & the staging , sampling, analyzing, and reporting of all soil excavation projects related to new equipment or floor repairs.
  • Prepare Work Plans for all new building and equipment expansion projects to satisfying a Consent Agreement with U.S. EPA and PADEP.

Asbestos / Lead Abatement Supervise Asbestos Abatement crew -

  • 14 month removal operation.
  • Excavation and removal of unknown drums and asbestos pipe lagging.
  • Responsibilities included heavy equipment operation and field supervision.

Agency / Responsible Party Negotiation
Coordination of legal and technical meetings with and between -

  • The Nineteen Settling Companies.
  • The U.S. EPA,
  • The Ohio EPA,
  • The Company's remedial prime contractor,
  • Review and approve invoices submitted by the Company's remedial prime contractor.
  • Review all work Plans and other documents related to the Project,
    • The Remedial Investigation,
    • The Feasibility Study
    • The Record of Decision

UST
Researched, developed and contracted -

  • The removal of three (3) 4,000 gallon underground fuel oil storage tanks.
  • The underground storage tanks were removed,
  • Then replaced with one (1) diked, 9,000 gallon above ground storage tank.
  • Over pressure shut off valves and other safe guards for pumping fuel oil were incorporated in the design.

Industrial Services
Designed and implemented -

    Installation of new tube mill facility including:
    • Plant layout, buildings,
    • Weld plants,
    • Handling equipment,
    • Ultrasonic testing equipment,
    • Straightening and cutting equipment,
    • And ancillary equipment such as compressor air and cooling water systems.
Design Engineered, Designed and Approved -
    Installation of complete Titanium Melting Shop including
    • Buildings,
    • Overhead cranes,
    • Vacuum arc furnaces,
    • Copper crucible cleaning machine,
    • Vacuum weld chamber,
    • Vacuum pumps,
    • Cooling water systems,
    • Compressed air systems,
    • Concrete furnace bunkers and foundations.

SITE CHARACTERIZATION / REMEDIATION

Site charecterization and remediation of -

  • Mixed wastes from the uranium mill operation,
  • Demolition and decontamination of process equipment,
  • Removal and eventual on-site burial in the tailings pile,
  • Budget management as well as project management.
Provided over site of -
  • Site sampling and charecterization of mixed wastes from a uranium mill operation,
  • Draining and containerizing of mechanical fluids from mill equipment,
  • Decontamination and demolition of yellow cake ovens,
  • Remediation of chemical process vats,
  • Field work and supervision
RADIOLOGICAL

Environmental Health and Safety oversite at a Department of Energy Decommissioning Project -

  • Sampling and waste profiles for mixed wastes leading to disposal,
  • Routine safety and industrial hygiene monitoring,
  • Environmental evaluations of contaminated debris to meet off-site disposal site's waste acceptance criteria,
  • Modifications and revisions to RCRA Part B Permit for mixed and PCB wastes,
  • Field supervision, sampling, and reporting in support of free-release of areas and equipment,
  • Oversite of major equipment removal,
  • Sampling and reporting in compliance with NPDES Permit requirements,
  • Generate and review Work Instruction Packages and Operations Work Requests for decommissioning activities.